Record breaking achievements have been made on our water and effluent volumes across the Craigavon site. The first quarter of 2012 site metering data shows performance is the best yet. The key highlights are:

• Weekly water usage down by 1.5 million litres per week (20% reduction)
• Weekly effluent volume down by 1.5 million litres per week (20% reduction)
• Ready to Eat Factory Traywash project savings
• Removing large water pipes at Ready to Eat Ovens